top of page

Transmitter
Road (CR 2327)
Bike Lanes & 
Resurfacing 

 

Gortemoller Engineering, Inc. served as the Prime Design Consultant providing engineering design services and construction management for the 1.49-mile bike lanes, drainage improvements, and resurfacing of Transmitter Road in Bay County, Florida. Bike lanes were added to both sides of Transmitter Road from SR 22 to SR 30A (US 98 / 15th Street).

 

The project included environmental permitting assistance, limited drainage review, utility coordination, roadway widening/resurfacing and signing and pavement marking design.

 

This project was a Design-Build through C.W. Roberts Contracting, Inc. 

SERVICES PROVIDED: 

Minor Highway Design

Drainage Improvements

Environmental Permitting Assistance

Signing & Pavement Marking Design

Utility Coordination 

Bike Lanes  

CLIENT: 

Bay County 

LOCATION: 

Panama City, Florida

CONSTRUCTION COST:

$1,172,900

IMG_0575.JPG
IMG_0572.JPG
IMG_0569.JPG
IMG_0567.JPG
bottom of page