top of page
Highway Bridges

ROADWAY DESIGN

 

• Major/ Minor Roadway Design
• Sustainable Design

• Signing and Pavement Marking Analysis

• Roadway Alignment


 

Our Experience

DJI_0019.JPG

PHILIP GRIFFITTS SR. PARKWAY PHASE II NEW ROADWAY ALIGNMENT

IMG_9957.jpeg

SR 20 FROM SR 77 TO SR 75 (US 231) RESURFACING /RECONSTRUCTION

IMG_0566_edited.jpg

TRANSMITTER ROAD RESURFACING & BIKE LANES DESIGN-BUILD

IMG_4359.jpg

JENKS AVENUE WIDENING & RECONSTRUCTION DESIGN-BUILD

IMG_9859.jpeg

SR 75 (US 231 / HARRISON AVE) FROM SR 30 (US 98B / 6TH ST) TO SR 30A (US 98 / 15th ST) RESURFACING 

IMG_0050.JPG

FRANKFORD RESURFACING & SIDEWALK DESIGN-BUILD

bottom of page