top of page

MAGNOLIA BEACH ROAD 
MULTI-USE PATH

Gortemoller Engineering, Inc. served as the Prime Design Firm providing professional engineering services for the design of an approximate .75-mile 8' Multi-Use Path along the north side of Magnolia Beach Road from Delwood Beach Road to Annette Avenue. The Multi-Use Path was designed to connect to the existing Multi-Use Path on the south side of Magnolia Beach Road at Annette Avenue. The project included drainage improvements, compliancy with FDOT requirements and emphasis on ADA requirements, as well as sign and pavement markings design as warranted from the Multi-Use Path/Sidewalk. 

SERVICES PROVIDED: 

Multi-Use Path Design

Drainage Improvements

ADA improvements

Sign & Pavement Markings 

CLIENT: 

Bay County    

LOCATION: 

Bay County, Florida

Cost: 

$490,152

IMG_1149.jpg
IMG_1151.jpg
IMG_1158.jpg
bottom of page